REV, Part 11: Load Growth, One Feeder at a Time (2018)

A West Haverstraw non-wires solicitation shows what a real deferral need looks like, while National Grid looks to street lights for platform revenue.

Charlie Umberger4 min read

Part 11 of 11 in the Reforming the Energy Vision series (NY PSC Case 14-M-0101).

Four years into REV, two 2018 filings show where the value conversation had landed. One is a non-wires solicitation for a single overloaded neighborhood, with growth, hours and megawatts spelled out. The other is a utility looking past avoided T&D entirely, to platform revenue from street lights.

West Haverstraw: what a real deferral need looks like

On June 29, 2018, Orange & Rockland filed its request for proposals for a non-wires alternative in West Haverstraw. The problem was specific. Two of the three circuits serving the village share a double-circuit pole line, and "During peak summer loading periods, the remaining area circuit cannot support the entire load." The traditional fix "would include the construction of a new underground circuit from the West Haverstraw substation to the intersection of Route 202 and Route 9W" [F1 p.4].

The cause was growth. In O&R's words: "Increased load growth in the area have eradicated full backup and redundancy capability of local circuits, resulting in some area customers remaining out of power until repairs are completed" [F1 p.8].

And the RFP put numbers on the need [F1 p.8]:

  • Megawatts: the "Total Needed Reduction" rises from 4.44 MW in 2019 to 5.83 MW in 2030.
  • Hours: "Yearly Hours of Risk" rise from 759 in 2019 to 1,172 in 2030.
  • Time of day: "The hours of relief needed in 2018 to 2030 are from 6a.m. to 11p.m."

The three circuits served "4,179 customers" [F1 p.7]. O&R said it would "leverage its existing EE and DR programs to lower the amount of DER that needs to be procured" [F1 p.7], and it pointed bidders to its benefit-cost analysis (BCA) Handbook for how proposals would be valued [F1 p.4].

Set that next to the 2015 record. Con Edison and O&R had said deferral value depends on "Load growth rates and anticipated changes in load curve shapes" [F2 p.21]. West Haverstraw is the template: a growing load, a named asset, a forecast of the shortfall by year, and a window of relief that runs seventeen hours a day. That's the kind of need distribution value is built on.

Smart City: looking for value beyond avoided T&D

Three months earlier, National Grid proposed a demonstration in Schenectady using "approximately 4,275 street lights" as a communications platform [F3 p.3]. The value proposition wasn't avoided wires. It was platform revenue: "If successful, the Company expects to propose new tariff offerings and platform services revenues (“PSRs”) enabling municipal adoption of advanced street lighting and smart-city technologies across National Grid’s New York service territory" [F3 p.4]. National Grid saw scale behind it: "the more than 200,000 street lights that span its service territory could serve as the platform for the widespread adoption of smart-city technology" [F3 p.5].

It's a reminder that Track Two's "earnings from market-facing platform activities" [F4 p.5] were meant to be a second way for utilities to earn, alongside deferral. In a territory without much load growth, deferral opportunities are scarce, and platform revenue was one place to look.

Where the first four years left things

Reading 2014–2018 in order, a few things stand out:

  • REV started in a flat-load world. Staff's 2014 report said "The sales base for utilities is relatively flat while peak demand continues to grow" [F5 p.12]. The big early value estimates came from flattening the system peak, not from deferring growth-driven upgrades.
  • Distribution value turned out to be local and growth-driven. The utilities said so in 2015 and 2016, and the first distribution plans showed how much of the system had room to spare.
  • The rules for counting it got strict. Location-specific marginal costs, functional equivalence, diminishing returns, an end date when the upgrade is built anyway, and hours that match the local peak.
  • The earnings rule came first. Brooklyn-Queens showed a utility could earn on not building. Track Two made that general.
  • The places where it worked looked like West Haverstraw. A named asset, a growth forecast, a defined shortfall, and a procurement.

That's REV's first four years. The series introduction, Fast Forward, puts them next to today's debates.


Sources

F# Filing Date Document Pages cited Links
F1 14-M-0101, item 1139 2018-06-29 O&R West Haverstraw NWA RFP p.4, p.7, p.8 View filing · Original (NY DPS)
F2 14-M-0101, item 528 2015-10-26 Con Edison and O&R Track Two comments p.21 View filing · Original (NY DPS)
F3 14-M-0101, item 1102 2018-03-26 National Grid Smart City REV demonstration project proposal (Schenectady) p.3, p.4, p.5 View filing · Original (NY DPS)
F4 14-M-0101, item 748 2016-05-19 Track Two Order: Order Adopting a Ratemaking and Utility Revenue Model Policy Framework p.5 View filing · Original (NY DPS)
F5 14-M-0101, item 6 2014-04-25 DPS Staff Report and Proposal, Reforming the Energy Vision p.12 View filing · Original (NY DPS)

Page numbers are physical PDF pages.

Case 14-M-0101

Follow the case
About the Author

I have spent the last decade trying to get distributed energy resources on the grid, paid, operated, and integrated into utility operations and business.

Related Insights

Regulatory History

REV, Part 10: Who Captures the Value? Storage Business Models and the LMI Exception (June–August 2017)

By mid-2017, the question in REV was shifting from what is DER worth? to who gets the value? A Con Edison storage demonstration tried to split it between a host customer, a developer, the utility and the wholesale market. Two months later, the Commission clarified when a…

Compensation & Rates

Fast Forward: New York Is Still Arguing Over What a Kilowatt Avoids

The rest of this series moves through Case 14-M-0101 one filing at a time and never looks ahead. This post breaks that rule on purpose. Before we go back to 2014, here's where two of REV's biggest value questions stand in late 2026.