- Is Term-DLM failing, or is something else keeping new batteries out?
The PSC asked whether Term-DLM brings new batteries to the grid. The 2026 reports say no: Con Edison found 4 storage participants among 5,630, National Grid none. But DRV/LSRV uncertainty, Con Edison's interconnection limits and federal tariffs may be the real barriers.
November 20, 2026
- Fast Forward: New York Is Still Arguing Over What a Kilowatt Avoids
The rest of this series moves through Case 14-M-0101 one filing at a time and never looks ahead. This post breaks that rule on purpose. Before we go back to 2014, here's where two of REV's biggest value questions stand in late 2026.
November 20, 2026
- REV, Part 11: Load Growth, One Feeder at a Time (2018)
Four years into REV, two 2018 filings show where the value conversation had landed. One is a non-wires solicitation for a single overloaded neighborhood, with growth, hours and megawatts spelled out. The other is a utility looking past avoided T&D entirely, to platform…
November 20, 2026
- REV, Part 10: Who Captures the Value? Storage Business Models and the LMI Exception (June–August 2017)
By mid-2017, the question in REV was shifting from what is DER worth? to who gets the value? A Con Edison storage demonstration tried to split it between a host customer, a developer, the utility and the wholesale market. Two months later, the Commission clarified when a…
November 20, 2026
- REV, Part 9: Paying for Performance — The Standby Credit and the Scorecards (December 2016–June 2017)
Track Two set the framework for how utilities earn. The fights that followed were about the details of how customers and DER get credited, and how anyone would measure whether REV was delivering. Two filings from this period show the same tension from different sides: should…
November 20, 2026
- REV, Part 8: Where the Load Was — The First Distribution Plans (June 2016–March 2017)
On June 30, 2016, New York's utilities filed their first Distributed System Implementation Plans (DSIPs). For the first time, the people valuing DER could see the utilities' own growth forecasts, beneficial locations and benefit-cost handbooks. What they showed, at least in…
November 20, 2026
- REV, Part 7: Track Two — Getting Paid for Not Building (May 2016)
On May 19, 2016, the Commission issued its Order Adopting a Ratemaking and Utility Revenue Model Policy Framework, the Track Two Order. If Track One decided who would run the platform, Track Two decided how the platform would make money. Its starting premise was that the old…
November 20, 2026
- REV, Part 6: Planning for Growth — Baldwinsville and the DSIP Guidance (March–April 2016)
By spring 2016, New York had a test for value. What it needed next was information: where the grid was constrained, where load was growing, and where DER could actually defer something. Two filings from March and April show the gap from both ends: one utility's first open…
November 20, 2026
- REV, Part 5: Counting Value — The Societal Cost Test Wins (January 2016)
On January 21, 2016, the Commission issued its Order Establishing the Benefit Cost Analysis Framework. It settled which test New York would use to decide whether DER is worth buying, which benefits count, and how to value avoided distribution. Two weeks earlier, a…
November 20, 2026
- REV, Part 4: The "Value of D" — Staff's 2015 White Papers and the Utilities' Reply (July–October 2015)
In the summer of 2015, Staff issued two white papers: one on benefit-cost analysis (July 1) and one on ratemaking and utility business models for Track Two (July 28). Together they set out New York's first detailed answer to the question every DER docket asks: what is a…
November 20, 2026
- REV, Part 3: The Utility Becomes the Platform (February–March 2015)
On February 26, 2015, the Commission issued its Track One Order, the "Order Adopting Regulatory Policy Framework and Implementation Plan." It made the distribution utilities the platform for distributed energy resources. It also gave the clearest statement yet of the…
November 20, 2026
- REV, Part 2: Putting a Price on "System Value" — The Straw Proposal and the First Fights (July–December 2014)
The April 2014 Staff report promised to "monetize" system values. Over the rest of 2014, Staff and the parties started arguing about what those values were, who would calculate them, and how much they were worth.
November 20, 2026
- REV, Part 1: Flat Sales, Rising Peaks — Why New York Decided to Rewire Utility Regulation (April 2014)
On April 25, 2014, the New York Public Service Commission opened Case 14-M-0101, Reforming the Energy Vision. It said it would "comprehensively consider how our regulatory paradigm and retail and wholesale market designs either effectuate or impede progress toward achieving…
November 20, 2026
- Maryland's NEM Successor: The Fight Over Solar's Value
Maryland must replace retail-rate net metering by July 1, 2027. The consultants' model and the PC78 comments split on one question above all: what value does distributed solar really deliver, and to whom?
November 13, 2026
- Con Edison's Plan to Pay Batteries for NYC Reliability
Consolidated Edison submitted a Reliability Contingency Plan that relied primarily on market‑based battery storage (transmission‑ and distribution‑connected) plus firm non‑emitting solutions to meet Zone J transmission security shortfalls projected to begin in 2033 (125 MW) and rise to 675 MW by 2036. The filing requested Commission authorization to extend the UDR bulk storage in‑service deadline to December 31, 2036 and to approve a new Reliability Asset Dispatch Rights (RADR) program to convert eligible VDER storage into 15‑year utility dispatch contracts, while flagging wide cost uncertainty and the energy‑limited nature of storage.
October 2, 2026
- New York's Utilities Want to Rethink How Batteries Get Paid (DRV)
The NY Joint Utilities just recommended what may be the biggest changes to DRV since it was created. The core ideas are simple: Compensate storage where it is needed, when it is needed, and at a competitive rate.
March 25, 2026