REV, Part 4: The "Value of D" — Staff's 2015 White Papers and the Utilities' Reply (July–October 2015)

Staff proposed valuing DER at LMP plus a 'value of D.' The utilities answered that distribution value depends on where load is growing.

Charlie Umberger6 min read

Part 4 of 11 in the Reforming the Energy Vision series (NY PSC Case 14-M-0101).

In the summer of 2015, Staff issued two white papers: one on benefit-cost analysis (BCA) (July 1) and one on ratemaking and utility business models for Track Two (July 28). Together they set out New York's first detailed answer to the question every docket on distributed energy resources (DER) asks: what is a kilowatt on the distribution system worth? The utilities' October comments answered with a blunt point about load growth.

The BCA white paper: why one number doesn't work

Staff wrote that "advances in both distributed resources and information and communication technologies will both allow and require more dynamic and granular methods for valuing distribution level benefits and costs" [F1 p.16]. Its treatment of avoided distribution capacity is the core of the paper:

"Traditionally, avoided transmission and distribution (T&D) infrastructure need is considered on a system average basis and is estimated as a single dollar-per-kW value. However this estimation may significantly over- or under-value load modifications. Detailed marginal cost of service studies are necessary to fully determine the value of incremental or avoided T&D infrastructure needs." [F1 p.24]

Staff then explained what drives the value. "Generally speaking, the primary driver of incremental need for T&D investment is additional incremental load during a single hour of system peak demand." But the answer depends on where the load sits: "whether or not such load would actually trigger additional infrastructure need should be considered" [F1 p.24]. Headroom matters most: "a reduction in load in an area which is near, at, or above its design criteria may allow the utility to defer needed investment whereas a similar load reduction in an area of greater excess capacity may have no impact on T&D costs" [F1 p.25]. So does voltage: "load additions or reductions connected to the utility system at high voltage will not affect the need for lower voltage infrastructure" [F1 p.25].

Two more warnings in the paper matter as much today as they did then:

  • Diminishing returns. "the value of avoiding distribution level capacity costs will decline as resources are added to a constrained local area" [F1 p.10].
  • Don't count wholesale value twice. "A portion of the Avoided Transmission Capacity Infrastructure and related O&M costs are included in both the Avoided Generation Capacity (ICAP) and Avoided Energy (LBMP) benefit categories" [F1 p.20]. On price suppression, Staff observed that "Often, estimates of wholesale market price impacts exceed resource cost savings by orders of magnitude," and called them "more of a transfer payment (a shifting of dollars) from generators to consumers, but not a resource efficiency gain" [F1 p.22].

What a marginal cost study looked like in 2015

Staff attached Con Edison's 2012 marginal cost study as an example. Its system-weighted marginal distribution cost was $90.05 per kW of system peak in 2014, rising in the study's forecast to $242.15 in 2020 and $414.37 in 2030 (nominal) [F2 p.23]. But the study itself cautioned that "These avoided costs apply to system wide programs targeted at all customers and do not reflect the unique impacts of programs that would be targeted only at customers in a specific location" [F2 p.23]. The system-wide number was a starting point, not a locational value.

The Track Two white paper: locational marginal price (LMP)+D

Staff's ratemaking paper named the gap directly: "there is an incomplete understanding of the full value that DERs provide to the system, and thus insufficient information on which to base investment and usage choices" [F3 p.78]. Its proposed framework was "LMP+D": "The value of D when added to the location-based marginal price of energy (LMP) will constitute the full value of DER to the system" [F3 p.78].

The hard part was the D. "While the LMP is already well established and transparent, the value of D is not." Staff wanted it quantified, because "For purposes of the utility transaction, it is essential to quantify the distribution system value that DERs can provide," and it recommended that "Software to determine distribution-level marginal costs should be adopted by New York’s utilities" [F3 p.94].

The paper also tied valuation to the flat-sales problem. "As the costs of self-generation decline and the feasibility of grid defection increases, rate design analysis becomes more complex." If customers could only avoid distribution charges by leaving the grid, "then remaining customers will absorb the cost contribution that the exiting customer would otherwise have made" [F3 p.93].

The utilities' reply: the value depends on load growth

Con Edison and Orange & Rockland's October 26 comments included a section titled "How, When, and Where Do DER's Provide Locational Value?" It's the most direct statement in the 2015 record about load growth and value:

"The value of distribution deferral varies significantly across local distribution areas because of :" ... "Load growth rates and anticipated changes in load curve shapes, which affect how long infrastructure upgrades can be deferred" [F4 p.21]

And then: "In areas with excess distribution capacity and where local, coincident peaks are declining or growing slowly, the value of distribution capacity relief can be minimal. By contrast, in areas such as Brooklyn-Queens, where a large, growth related investment is imminent, the value of distribution capacity relief can be quite substantial" [F4 p.21].

The same section made two points about how deferral has to be bought. "Demand management through DERs needs to ramp up at the right time and right place to provide distribution relief or deferral value." And "To avoid or defer distribution investments, incremental DER distribution capacity needs to be procured in advance. If it shows up, unannounced and unaccounted for, there may not be enough lead time to incorporate it into distribution planning" [F4 p.21].

Exelon, filing in Track Two the same day, described the revenue side of the same picture: utilities "face new and significant challenges due to declining electric sales growth, the need for increased investment, and new enabling technologies" [F5 p.17]. It argued for more demand and fixed charges to "ensure adequate cost recovery in a world of low or declining load growth" [F5 p.18].

The takeaway

By the end of 2015, the record held two ideas side by side. Staff wanted a granular, location-specific "value of D." The utilities agreed value was local, and added that in most places, with little load growth, it might be close to nothing. The question was how the Commission would write that into a framework.


Sources

F# Filing Date Document Pages cited Links
F1 14-M-0101, item 392 2015-07-01 Staff White Paper on Benefit-Cost Analysis p.10, p.16, p.20, p.22, p.24, p.25 View filing · Original (NY DPS)
F2 14-M-0101, item 392 2015-07-01 Staff BCA White Paper, Appendix B (Con Edison 2012 marginal cost study) p.23 View filing · Original (NY DPS)
F3 14-M-0101, item 416 2015-07-28 Staff White Paper on Ratemaking and Utility Business Models (Track Two) p.78, p.93, p.94 View filing · Original (NY DPS)
F4 14-M-0101, item 528 2015-10-26 Con Edison and O&R Track Two comments p.21 View filing · Original (NY DPS)
F5 14-M-0101, item 532 2015-10-26 Exelon Track Two comments p.17, p.18 View filing · Original (NY DPS)

Page numbers are physical PDF pages.

Case 14-M-0101

Follow the case
About the Author

I have spent the last decade trying to get distributed energy resources on the grid, paid, operated, and integrated into utility operations and business.

Related Insights

Regulatory History

REV, Part 3: The Utility Becomes the Platform (February–March 2015)

On February 26, 2015, the Commission issued its Track One Order, the "Order Adopting Regulatory Policy Framework and Implementation Plan." It made the distribution utilities the platform for distributed energy resources. It also gave the clearest statement yet of the…

Regulatory History

REV, Part 5: Counting Value — The Societal Cost Test Wins (January 2016)

On January 21, 2016, the Commission issued its Order Establishing the Benefit Cost Analysis Framework. It settled which test New York would use to decide whether DER is worth buying, which benefits count, and how to value avoided distribution. Two weeks earlier, a…