Introduction to the Reforming the Energy Vision series (NY PSC Case 14-M-0101).
The rest of this series moves through Case 14-M-0101 one filing at a time and never looks ahead. This post breaks that rule on purpose. Before we go back to 2014, here's where two of REV's biggest value questions stand in late 2026.
REV's answer to "what is a distributed resource worth?" became the Value Stack under Value of Distributed Energy Resources (VDER), the tariff that pays distributed solar and storage component by component. Two of those components are the subject of this post:
- Avoided distribution cost, paid through the Demand Reduction Value (DRV) and the Locational System Relief Value (LSRV). The Commission reopened both in 2025–2026, and the argument sounds a lot like 2016.
- Avoided capacity cost, paid through the Value Stack's Installed Capacity (ICAP) component. New York Independent System Operator (NYISO)'s own planning book counts distributed storage at about half of what the tariff pays it for.
Both come back to the question this series is built around: is the value being paid for also being counted?
The avoided T&D fight, 2025–2026
How we got here
The Value Stack's distribution credits come from each utility's marginal cost of service (MCOS) study, an estimate of the grid upgrades that load growth will force in the next ten years. The Commission opened a separate case on those studies in 2019 because, in Staff's summary, "significant variations existed in how the MCOS studies are conducted across the Joint Utilities" [F1 p.2]. It set a common method in August 2024. The utilities filed new studies on June 30, 2025, and Staff proposed new DRV and LSRV values on December 11, 2025 [F1 pp.3–4].
The 2016 cost-benefit order said granular MCOS studies were the way to get avoided T&D right. Ten years later, they exist. The fight now is over what to do with them.
Staff: pay the long-run cost, but only where there is one
Staff's starting point is that "VDER compensation should be based on long run avoided costs" [F1 p.4]. The key move is how to average. Staff drops substation areas with no planned projects, then averages the rest. Its reasoning frames the whole debate in two sentences. Counting zero-cost areas "is overly short run and would provide a signal that absolutely no DER entry is warranted in that substation area." But adding up every cost segment everywhere "unreasonably provides a price signal that full scale competitive entry is needed everywhere, now" [F1 p.6].
Staff would set DRV at 100% of that system-wide figure and stop "de-averaging" it to fund LSRV. LSRV becomes a separate adder for the highest-cost areas, set at 1.645 standard errors above average, so that it covers "about ten percent of a company's service areas" [F1 p.8]. Location alone wouldn't be enough to qualify. As Staff put it, "just because a DER project is located in a significantly higher cost area does not mean that the project will be able to meet the utility's planning needs," so LSRV projects would also have to meet dispatch and reliability terms in the tariff [F1 p.9].
Here's what that does to the numbers ($/kW-year) [F1 p.15]:
| Utility | Current DRV | Joint Utilities' method | Clean Energy Parties' method | Staff proposal |
|---|---|---|---|---|
| Con Edison | 199.40 | 126.27 | 252.54 | 252.54 |
| Central Hudson | 14.55 | 10.82 | 21.64 | 21.64 |
| NYSEG | 29.67 | 42.62 | 85.23 | 85.23 |
| National Grid | 61.44 | 73.30 | 146.59 | 146.59 |
| O&R | 64.78 | 11.37 | 22.73 | 22.73 |
| RG&E | 31.92 | 33.43 | 66.85 | 66.85 |
Two things stand out. The utilities' method gives exactly half of Staff's figure for every company. And the update doesn't raise values across the board: Con Edison's DRV would rise about 27%, while O&R's would fall about 65%.
The utilities: you're already overpaying
The Joint Utilities' reply comments read like the 2016 record with bigger numbers. In Con Edison's territory, they wrote, there are "billions of dollars of DRV payments committed to energy storage projects," with "double the 2030 target for distribution-connected energy storage capacity either operating or under contract today" [F3 p.2]. Their central claim is that the Value Stack "has also resulted in overcompensation in areas where DER injections do not result in distribution peak reductions that potentially offset utility costs" [F3 p.2].
Their remedy follows from that. MCOS "should be considered the maximum compensation available" [F3 p.3]. And "in locations where load shapes are sufficiently flat such that incremental DER discharge will not result in reduction of the local distribution peak, there should be no opportunity for DERs to receive compensation for the DRV component of the Value Stack" [F3 p.7]. They also say the fixed four-hour DRV window "has the effect of creating dual peaks on both sides of the export window, while not effectively reducing the local peak" [F3 p.6]. A battery can fully meet the tariff and still not cut the peak the tariff is paying for.
In 2016, the Joint Utilities told the Commission the value of D "could be zero or even negative." In 2026, they're asking for a tariff that pays zero where it is zero.
The clean energy parties: MCOS is the floor, not the ceiling
The Clean Energy Parties (NYSEIA, SEIA, NY-BEST, ACE NY, CCSA and Advanced Energy United) back Staff's 100% DRV and argue it's still conservative. In their view, "MCOS is an underestimation of the true value of Distributed Energy Resources (DERs) as it ascribes no value to unknown upgrades nor does it account for the significant load growth we expect to see beyond the 10-year study period" [F2 p.3]. They asked for a fast order so solar projects could start construction before the federal tax credit cutoff of July 4, 2026, with LSRV details worked out later [F2 pp.2–3].
They also point out that the 2024 MCOS order told utilities to include avoided transmission costs in the studies [F2 p.1]. In 2016 the Commission warned that part of avoided transmission value is already captured in wholesale capacity and energy prices. With transmission now in MCOS and capacity paid separately in the same Value Stack, the overlap question deserves a close look in the final order.
Where it stands
Staff's proposal drew initial comments in March 2026 and replies in April. As of the filings we reviewed through mid-November 2026, the Commission had not issued an order setting new DRV or LSRV values. The utilities want DRV and LSRV decided together; the clean energy parties want DRV first. Both sides now accept the old 2016 premise that avoided T&D depends on location and timing. They disagree about whether the default for the rest of the grid should be the full average or zero.
Two counts of the same battery
The second value stream is capacity, and here the gap is between two parts of New York's own system.
What the tariff pays
For dispatchable resources like batteries, the Value Stack's capacity component uses Alternative 3. The single statewide coincident peak (CP1) determines the tag. The project's capacity "tag" is "determined by kWh grid injections during the single statewide coincident peak (CP1) during the ICAP Season (defined as non-holiday weekdays in July and August)," a construct "designed to avoid systemwide capacity costs" [F4 p.42]. A battery that discharges at full output in that one hour earns its full output as a tag, paid monthly at the zone's capacity price. One market analysis of the tariff notes that "No duration-based accreditation factor applies, unlike the wholesale capacity stream" [W1]. A four-hour battery selling into NYISO's capacity market gets derated. The same battery on the Value Stack doesn't.
And batteries are hitting the hour. NY-BEST reports that among companies with 40 MW of operating storage in New York City, "greater than 95% of this capacity was successfully discharged during the Summer 2025 ICAP Market Peak" [F5 p.4].
What the planning book counts
NYISO's Gold Book is the annual load and capacity forecast that feeds reliability planning. It tells a different story. In NY-BEST's reading of the 2025 edition, "the NYISO Gold Book lists 67 MW of distributed energy storage deployed in Zone J in 2025," but "it credits only 34 MW toward meeting the 2025 summer peak—a 50% haircut." For 2030, NYISO "projects 295 MW of energy storage capacity but credits only 148 MW toward peak reduction" [F5 pp.3–4].
Part of the gap is about categories. NY-BEST notes that "NYISO lists all energy storage interconnected on the distribution system (and not participating in the wholesale markets) as Behind-the-Meter storage," even though much of it is front-of-the-meter and built to dispatch on a utility signal [F5 p.4]. A customer battery managing a demand charge and a 5 MW Value Stack battery chasing the peak hour end up in the same row.
Two readings of the same gap
NY-BEST's reading: the planning book is wrong. Current planning "systematically undervalues distributed energy storage as a reliability resource," and if NYISO and Con Edison keep undercounting it, "New York risks over-reliance on costly grid infrastructure upgrades" [F5 pp.3–4].
The skeptic's reading: the tariff is ahead of the planning. A capacity payment is an avoided cost only if it reduces the capacity New York has to buy. If NYISO's forecast counts a battery at half its output, the reliability requirement only shrinks by half, while the Value Stack pays for the whole hour. Until planning and payment agree, part of what's labeled "avoided capacity" may be a shift of cost between customers rather than a saving.
Both can be partly true, and the parties already seem to sense it. In the same DRV docket, NineDot proposed a new capacity option ("ICAP-Alt4") that would cap some reported performance at NYISO's capacity accreditation factor for the battery's duration class [F4 p.43]. That is, it would bring the tariff closer to how the grid operator counts the same resource.
The common thread
In 2016, New York wrote down that avoided T&D is real only where a specific constraint exists and the resource reliably relieves it. Ten years on, both Value Stack debates turn on a related question: does the process that sets the avoided cost actually count the resource that gets paid?
- On distribution, the utilities say DRV pays where batteries don't cut the local peak. The industry says MCOS leaves out upgrades nobody has planned yet.
- On capacity, the tariff pays for performance in the peak hour. The Gold Book credits about half of distributed storage toward the peak.
If your state is building its own Value Stack, add one item to your checklist: find the planning document that's supposed to shrink when the resource shows up, and check whether it does.
Sources
| Ref | Filing | Date | Document | Pages cited |
|---|---|---|---|---|
| F1 | NY PSC 15-E-0751, item 1532 | 2025-12-11 | DPS Staff Proposal on Updating DRV and LSRV for VDER Compensation | pp.2–9, 15 — View filing · Original (NY DPS) |
| F2 | NY PSC 15-E-0751, item 1558 | 2026-03-16 | Clean Energy Parties Comments on Staff's DRV and LSRV Proposal | pp.1–3 — View filing · Original (NY DPS) |
| F3 | NY PSC 15-E-0751, item 1569 | 2026-04-06 | Joint Utilities' Reply Comments on Staff DRV/LSRV Proposal | pp.2–3, 6–7 — View filing · Original (NY DPS) |
| F4 | NY PSC 15-E-0751, item 1559 | 2026-03-17 | NineDot Energy Comments on MCOS, DRV and LSRV | pp.42–43 — View filing · Original (NY DPS) |
| F5 | NY PSC 25-E-0764, item 3 | 2026-01-13 | NY-BEST whitepaper, "Unlocking Distributed Energy Storage to Address Reliability Needs in New York City" | pp.3–4 — View filing · Original (NY DPS) |
| W1 | Modo Energy | Jul 2026 | VDER model documentation (ICAP Alternative 3 settlement) | docs.modoenergy.com |
References to the 2016 benefit-cost order and the Track Two record are cited in Parts 5 and 7 of this series. Page numbers are physical PDF pages.