Part 7 of 11 in the Reforming the Energy Vision series (NY PSC Case 14-M-0101).
On May 19, 2016, the Commission issued its Order Adopting a Ratemaking and Utility Revenue Model Policy Framework, the Track Two Order. If Track One decided who would run the platform, Track Two decided how the platform would make money. Its starting premise was that the old model no longer worked: the Commission "has concluded that its core statutory duties can no longer be met with the utility regulatory model of the previous century" [F1 p.4].
The assumptions that "may no longer hold"
The order listed the assumptions behind cost-of-service ratemaking. The first is about load: "the customer demand driving capital investment was largely beyond the influence of utilities and regulators." The second: "economies of scale almost invariably favored large utility-scale investments" [F1 p.6].
It described the pressure the same way REV had since 2014: "The combination of large impending infrastructure needs, decreasing system efficiency, environmental demands, weather and customer driven resilience requirements, and an increasing ability for customers to choose other options" presented challenges. "Left unaltered, the current utility and regulatory model could lead to uneconomic grid defection and eventually result in stranded investments and increasing financial challenges" [F1 pp.7–8].
Four ways to earn
The fix was to give utilities ways to make money other than building. "Utilities will have four ways of achieving earnings: traditional cost-of-service earnings; earnings tied to achievement of alternatives that reduce utility capital spending and provide definitive consumer benefit; earnings from market-facing platform activities; and transitional outcome-based performance measures." The aim was for utilities to "create shareholder value, comparable to or superior to conventional investments," by bringing in third-party solutions [F1 p.5].
Brooklyn-Queens as the model
The order held up Brooklyn-Queens as the template for the second of those four. "Recognizing that the utility is displacing capital investment with operating expenses, and thus foregoing the growth of its rate base, the Commission authorized a return on total program expenditures, as well as performance incentives tied to the achievement of goals that will produce customer savings" [F1 p.9].
It made that a standing policy for non-wires alternatives: "we expect to approve n/w/a projects that will result in customer savings, with earnings opportunities for utilities that are commensurate with or superior to earnings that can be achieved through traditional investments" [F1 p.50].
A week later, a Con Edison presentation filed in the docket summarized what Brooklyn-Queens was solving. "Sub-transmission feeders serving two networks in Brooklyn and one network in Queens overloaded (>800MW)." The "Targeted peak period" was "12pm-12am." And the "Commission approved: Customer Sided 41 MW ($150m), Utility Sided 11 MW ($50m)" [F2 p.9]. The utility-side piece included a "12 MWh battery storage system installed at a unit substation" [F2 p.10].
The value of D, according to the parties
The order's Appendix C summarizes what parties said about Staff's "LMP+D" proposal. The Joint Utilities' position, as summarized, is the clearest statement in the Track Two record about where distribution value lives:
"In many cases, the locational and/or temporal value of D could be zero or even negative if system investments are required to accommodate incremental DERs." ... "The greatest value DERs can provide to the planning and operation of the distribution system is in distribution capacity relief, i.e., in deferring or avoiding significant capital investments necessary to address prospective reliability needs in locations that are experiencing load growth." [F3 p.141]
They added that the value "must reflect the certainty of long-term DER performance," and that they were "unconvinced that there is a current software solution to determine distributional-level marginal costs" [F3 p.141]. On environmental value, they said that if the Commission wanted "to incent environmental outcomes at a value above the market value of emissions already captured in the LMP, it should do so in a transparent manner" [F3 p.142].
Multiple Intervenors, representing large customers, warned that valuing distributed energy resources (DER) through locational marginal price (LMP)+D "could (i) lead to reliance on inaccurate values, (ii) result in the subsidization of DERs by other customers, (iii) materially increase rates and bills for customers, and (iv) be contrary to the public interest" [F3 p.142].
The takeaway
Track Two gave New York the earnings rule that makes deferral possible: a utility can earn on not building, as Brooklyn-Queens showed. But the parties' own descriptions of value put a boundary around it. The greatest value was where load was growing against a constraint, and in many other places, the utilities said, the value of D could be zero or negative. The utilities' first distribution plans were due June 30.
Sources
| F# | Filing | Date | Document | Pages cited | Links |
|---|---|---|---|---|---|
| F1 | 14-M-0101, item 748 | 2016-05-19 | Track Two Order: Order Adopting a Ratemaking and Utility Revenue Model Policy Framework | p.4, p.5, p.6, pp.7–8, p.9, p.50 | View filing · Original (NY DPS) |
| F2 | 14-M-0101, item 756 | 2016-05-26 | Con Edison energy storage presentation (BQDM overview) | p.9, p.10 | View filing · Original (NY DPS) |
| F3 | 14-M-0101, item 748 | 2016-05-19 | Track Two Order, Appendix C (summary of comments) | p.141, p.142 | View filing · Original (NY DPS) |
Page numbers are physical PDF pages; the Track Two Order's own page numbers are 3 lower. Appendix C quotes are the Commission's summaries of party comments, not the parties' own filings.