Part 8 of 11 in the Reforming the Energy Vision series (NY PSC Case 14-M-0101).
On June 30, 2016, New York's utilities filed their first Distributed System Implementation Plans (DSIPs). For the first time, the people valuing distributed energy resources (DER) could see the utilities' own growth forecasts, beneficial locations and benefit-cost handbooks. What they showed, at least in one upstate utility's territory, was a system with very little load growth to relieve.
Central Hudson: most of the system had room to spare
Central Hudson's DSIP included a probabilistic load-growth study by substation and transmission area. Its illustrative example showed loads "declining at a rate of 1.8% per year" [F1 p.143]. Its findings for the distribution system were stark: "The majority of substations are experiencing slowing or declining loads or have ample room for growth without having to upgrade them" [F1 p.149].
There were exceptions. "Some substations, such as Lawrenceville and Grimley, are experiencing high growth levels but the growth trajectory is more uncertain because those substations have less historical hourly data than other sites." And "The only substation with limited room for growth is Woodstock. However, because of the distribution configuration, loads at Woodstock can be easily transferred to neighboring substations" [F1 p.149].
That's the 2015 utilities' point about value, now visible in the data. Where load is flat or falling and there's headroom, there's little or no distribution upgrade for DER to defer.
Con Edison: the rules for counting deferral
Con Edison's DSIP included its benefit-cost analysis (BCA) Handbook, which turned the Commission's framework into operating rules. Its general rule: "Project- and location- specific avoided distribution costs and deferral values should be used when and wherever possible." The reason: "Using system average marginal costs to estimate avoided transmission and distribution infrastructure need may result in significant over- or under-valuation of the benefits or costs, and may result in no savings in utility costs for customers" [F2 p.331].
The handbook set a performance bar: "Avoided distribution infrastructure benefits for a specific location are realized only if a DER project or portfolio of DER projects meets the engineering requirements for functional equivalence" [F2 p.331]. And it set an end date: "Once the peak load reduction is no longer enough to avoid or defer investment and infrastructure must be built, the constraint is relieved and benefits should not be realized from that point forward" [F2 p.331].
It also explained why location inside a service area isn't enough. On Con Edison's networks, "As the electrical distance from the DER to the point of need increases, the value of the DER in reducing the specific overload quickly lessens." On radial feeders, "a DER must be located “downstream” of the point of need (relative to the substation) to contribute to resolving the respective overload." And resources get derated for availability: "a demand response program may only be allowed to dispatch a maximum of 10 events per year," and solar's "variability and intermittence (e.g., due to clouds)" can limit its contribution [F2 p.330].
NYSEG and RG&E: locational value, deferred
NYSEG and RG&E defined "Beneficial locations" as "locations based on specified substations or circuits where DER may provide value to the distribution network from new infrastructure deferral, system reliability, and/or system efficiency benefits." But the dollar value would wait: "The locational value of DER will be addressed in the next stage after further policy guidance is provided" [F3 p.57]. Their roadmap called for working with the other utilities and New York Independent System Operator (NYISO) "to develop a common methodology for more granular locational marginal pricing" [F3 p.58].
Orange & Rockland: value isn't linear
Orange & Rockland's revised BCA Handbook, filed in August, gave the clearest single example of diminishing returns in the 2016 record: "The utility BCA must also address the non-linear nature of grid and DER project benefits." For instance, "If there is 1 MW of potentially deferrable capacity on a feeder with a new battery storage system, installation of a 5-MW storage unit will not result in a full 5 MW-worth of capacity deferral credit for that feeder" [F4 p.14]. It also warned that "It is important not to double-count benefits resulting from multiple measures or technologies functioning together to achieve an impact" [F4 p.13].
The Commission's response
In March 2017, in an order issued jointly in Case 14-M-0101 and the new DSIP docket, Case 16-M-0411, the Commission noted that the Initial DSIPs included "system planning efforts (including load and DER forecasts)" and called them "a first step toward providing customers and other parties with the information they need for identifying and characterizing near-term opportunities for DER development" [F5 p.3]. It focused its near-term guidance on "1) hosting capacity, 2) interconnection portals, 3) non-wires alternatives, 4) aggregated customer data privacy, and, 5) energy storage" [F5 p.4], and said the Supplemental DSIP "did not provide sufficient details" to track progress [F5 p.6].
The takeaway
The first distribution plans confirmed what the 2015 record predicted. In a flat-load world, avoided distribution value is concentrated in a few places, and the handbooks set strict tests for earning it: the right location, enough performance to be functionally equivalent to the wires, and value that shrinks as resources pile up and ends when the upgrade gets built. What the plans didn't yet have was a published locational price.
Sources
| F# | Filing | Date | Document | Pages cited | Links |
|---|---|---|---|---|---|
| F1 | 14-M-0101, item 782 | 2016-06-30 | Central Hudson Initial DSIP appendices | p.143, p.149 | View filing · Original (NY DPS) |
| F2 | 14-M-0101, item 781 | 2016-06-30 | Con Edison Initial DSIP (BCA Handbook) | p.330, p.331 | View filing · Original (NY DPS) |
| F3 | 14-M-0101, item 786 | 2016-06-30 | NYSEG and RG&E Initial DSIP | p.57, p.58 | View filing · Original (NY DPS) |
| F4 | 14-M-0101, item 823 | 2016-08-22 | Orange & Rockland BCA Handbook v1.1 | p.13, p.14 | View filing · Original (NY DPS) |
| F5 | 14-M-0101, item 942 | 2017-03-09 | Order on Distributed System Implementation Plan Filings (Cases 14-M-0101 and 16-M-0411) | p.3, p.4, p.6 | View filing · Original (NY DPS) |
Page numbers are physical PDF pages. The March 9, 2017 DSIP order was issued in both Case 14-M-0101 and Case 16-M-0411.