Part 1 of 11 in the Reforming the Energy Vision series (NY PSC Case 14-M-0101).
On April 25, 2014, the New York Public Service Commission opened Case 14-M-0101, Reforming the Energy Vision. It said it would "comprehensively consider how our regulatory paradigm and retail and wholesale market designs either effectuate or impede progress toward achieving the policy objectives underlying our system benefit programs and our regulation of electric distribution utilities" [F1 p.1]. Attached was a Staff report that explained why. Read today, the most striking thing about that report is its picture of load.
The problem: a grid built for a peak that only lasts a few hours
The Commission's order named the two assumptions behind the twentieth-century grid: "that demand is inelastic, and that economies of scale make central generating stations the most economic way to meet power needs." Those assumptions "supported a system designed to meet the forecast peak demand plus a substantial reserve margin. Because peak demand only occurs over a few hours per year, much of the system is underutilized most of the time" [F1 p.3].
Staff's report put numbers on it. The bulk system "is designed to meet retail peak demand, which in New York tends to be approximately 75 percent higher than the average load" [F2 p.10]. Statewide, "the total rate of system utilization is under 60 percent," where utilization means "average demand divided by peak demand" [F2 pp.10–11].
The squeeze: flat sales, growing peaks, aging wires
Among the "stresses" Staff listed, two stand out for anyone thinking about load growth today:
- "The sales base for utilities is relatively flat while peak demand continues to grow" [F2 p.12].
- "The state’s electricity infrastructure is aging; capital investment needed in New York over the next 10 years is estimated at $30 billion." Staff added that "Much of this sum reflects needed infrastructure replacement" [F2 p.11].
Flat sales and rising peaks meant more money spent on wires that sat idle most of the year, recovered from roughly the same volume of kilowatt-hours. The Commission also expected the peaks to get worse: "Weather-driven forecasts of higher peaks will exacerbate the inefficiencies of a system that is planned to meet unmanaged demand levels" [F1 p.3].
Staff saw one new source of load on the horizon: "The potential for wide scale adoption of rechargeable electric vehicles could challenge the capacity of some distribution circuits" [F2 p.12].
The proposed answer: put customers' resources to work, and pay them for it
Staff's response was to make demand management "not as a last resort but rather as a cost effective, primary tool" [F2 p.13]. The vehicle was a new utility role, the Distributed System Platform Provider (DSPP), which would coordinate customer resources "so that the utility's service area as a whole places more efficient demands on the bulk system, while reducing the need for expensive investments in the distribution system as well" [F2 p.14].
Staff was clear that wires spending wouldn't go away. "Traditional utility investments relating to needed transmission and distribution assets will remain necessary as aging infrastructure needs replacement, and system upgrades become necessary to meet load growth in particular regions." But distributed generation could "accommodate localized load growth without the need to upgrade feeders" [F2 p.18]. In other words, the deferral opportunity was local, tied to the places where load was actually growing.
The first statements on value
REV's name came from a value idea. Staff wrote that one effect of the reforms "should be to monetize, in manageable transactions, a variety of system and social values that are currently accounted for separately or not at all" [F2 p.8].
Staff also flagged, in April 2014, most of the valuation questions New York would spend the next decade on. Intermittent resources might have nameplate capacity that "may have to be discounted, depending on the extent to which they are complemented by storage." "Resources could be valued more highly, the closer to real time that they can be controlled directly by the DSPP." And if resources are customer-controlled, the DSPP "must have reconciliation mechanisms in place if and when a resource is unavailable when called upon" [F2 p.19].
It also acknowledged why utilities hadn't leaned on distributed energy resources (DER): "System planners are appropriately conservative, and inclined to consider only resources that are well known and can be relied upon to meet projected system needs" [F2 p.19].
Two tracks
The Commission set up two parallel tracks. Track One would address the platform role, with a goal "to reach a generic policy determination before the end of this year." Track Two would address ratemaking, with a policy determination expected "in the first quarter of 2015" [F1 pp.6–7]. It added a sixth policy objective, "Reduction of carbon emissions," on Staff's recommendation [F1 p.2].
The Commission also said the issues "are not unique to New York," but that "New York may, however, be particularly well-situated to provide leadership on this issue" [F1 p.4].
The takeaway
REV started from a specific load picture: flat sales, peaks still growing, $30 billion of replacement ahead, and growth concentrated "in particular regions." Everything that follows in this series, from valuation to utility earnings, was built on that picture.
Sources
| F# | Filing | Date | Document | Pages cited | Links |
|---|---|---|---|---|---|
| F1 | 14-M-0101, item 3 | 2014-04-25 | Order Instituting Proceeding | p.1, p.2, p.3, p.4, pp.6–7 | View filing · Original (NY DPS) |
| F2 | 14-M-0101, item 6 | 2014-04-25 | DPS Staff Report and Proposal, Reforming the Energy Vision | p.8, p.10, pp.10–11, p.11, p.12, p.13, p.14, p.18, p.19 | View filing · Original (NY DPS) |
Page numbers are physical PDF pages.