Part 3 of 11 in the Reforming the Energy Vision series (NY PSC Case 14-M-0101).
On February 26, 2015, the Commission issued its Track One Order, the "Order Adopting Regulatory Policy Framework and Implementation Plan." It made the distribution utilities the platform for distributed energy resources (DER). It also gave the clearest statement yet of the economics REV was responding to.
The load picture: sales growth had nearly stopped
The order described a grid that needed far more money while selling barely more electricity. "Based on planning reports filed by the state’s utilities and the NYISO, approximately $30 billion will need to be spent over the next decade to maintain current capabilities, compared with $17 billion over the past ten years" [F1 p.20].
At the same time, "shrinking energy sales and a poor load factor means the recovery of the investment will be made over a smaller consumer base." Sales were "projected to grow at a pace of only 0.16 percent per year through 2024." A footnote traced the decline: statewide sales growth "averaged 3.8% from 1966-1976, 1.5% from 1976-1986, 1.4% from 1986-1996, 0.9% from 1996-2006, and 0.3% from 2003-2013" [F1 p.20].
The Commission credited part of that to energy efficiency. But it spelled out the rate consequence: "a flat sales base means that increased costs from replacing infrastructure cannot be spread across a growing sales base and must instead be absorbed by existing customers" [F1 p.20]. And it warned about timing: "the longer the delay in identifying alternatives, the more risk of locking in inefficient investments" [F1 p.20].
The value claims
The order restated Staff's system-wide estimate: "If, for example, the 100 hours of greatest peak demand were flattened, long term avoided capacity and energy savings would range between $1.2 billion and $1.7 billion per year." Line losses cost "approximately $200-400 million per year" [F1 p.23].
It also made a broader claim about what the distribution monopoly was for: "The viability of intermodal competition provided by DER means that the monopoly function of power delivery is now more tied to ensuring reliability than it is to building delivery infrastructure" [F1 p.23]. And it set out the goal for valuation: "The system values of distributed resources will be monetized in a market, placing DER on a competitive par with centralized options" [F1 p.14].
Two value statements in the order point directly at the fights to come:
- On compensation: "because of the value that they provide to the grid, DER providers and their customers are entitled to compensation from the DSP" [F1 p.44].
- On net metering: photovoltaic (PV) "is currently enabled by net metering, which is an imprecise measure of the value of PV to the system and, at high percentages of total load, could place an inequitable burden on customers that are not able to own or install PV" [F1 p.28].
Why the utility, and not an independent platform
Opponents of a utility-run platform made their case. "Some ESCO and DER providers oppose utility involvement, arguing that the utilities will inevitably stifle market development and innovation by exercising their market power" [F1 p.49]. Infinite Energy argued "that if the Commission settles for a utility-operated DSP, it will likely be an irreversible policy choice." AGREE argued "that a for-profit corporation will not be properly motivated to perform the public interest functions of a DSP" [F1 p.50].
The Commission's answer turned on incentives, and on value. "Utilities do not currently have experience in operating an integrated grid on a large scale; grid operators may naturally be skeptical of the value of DER as a resource to secure reliable operations. By expanding the role of the utilities to include DSP functions, utilities will have the regulatory obligation, operational capability, and economic incentive to optimize the use of DER" [F1 p.52].
It was candid about the starting point: "utilities under traditional rate of return regulation are indifferent as to whether the rate of capital utilization is efficient" [F1 p.22]. And it put the responsibility on regulation, not just on utilities: "Utilities’ behavior with respect to DER has been responsive to the regulatory structure under which they have operated, including financial incentives and performance expectations imposed by the Commission" [F1 p.51]. Fixing those incentives was left to Track Two.
The order described the utility's new job in terms of load shape: to "reduce the investment and operating costs of delivery functions," "reduce peak demand and improve the overall system load factor," and "design and offer tariffs that allow it to monetize the value of DER as a mechanism to modify load" [F1 p.53].
The first pushback
A month later, the Alliance for a Green Economy, PUSH Buffalo, the Center for Social Inclusion and others asked for rehearing or clarification on two points: "Utility ownership of distributed energy resources (DER) for moderate and low-income customers" and "Opportunities for participation by members of the public and public-interest stakeholders in Track 2" [F2 p.3]. They supported the order's general rule that "utility ownership of DER will not be allowed unless markets have had an opportunity to provide a service and have failed to do so in a cost-effective manner," but questioned one of its exceptions [F2 p.4].
The takeaway
By March 2015, New York had decided who would run the platform and had said DER deserved pay for the value it provides. What it hadn't decided was how to measure that value. The Track One Order framed REV around flat sales and a poor load factor, which made the system-wide peak the big prize. If the distribution value was going to be found, it would have to be found location by location.
Sources
| F# | Filing | Date | Document | Pages cited | Links |
|---|---|---|---|---|---|
| F1 | 14-M-0101, item 324 | 2015-02-26 | Track One Order: Order Adopting Regulatory Policy Framework and Implementation Plan | p.14, p.20, p.22, p.23, p.28, p.44, p.49, p.50, p.51, p.52, p.53 | View filing · Original (NY DPS) |
| F2 | 14-M-0101, item 333 | 2015-03-31 | AGREE et al. Petition for Rehearing and/or Clarification | p.3, p.4 | View filing · Original (NY DPS) |
Page numbers are physical PDF pages; the order's own page numbers are 3 lower (physical p.20 is order p.17).